The second day of the Greater Accra Regional presidential tour began with the inspection and commissioning of the newly constructed Otanor to school Junction road.
The road which used to be a 6×6 meters culvert has now been expanded into a 20×20 meters culvert to accommodate the dual carriage road.
According to motorists, the road which was known to be a bumpy road, full of potholes, dusty and a major source of distress to motorists and residents, is now the best road to ply.
The project was a pre-financed one by the construction company called OSWAL investment limited. construction.
Inspecting the road, President Akuffo Addo congratulated OSWAl for a good job done and completed Seven month before time schedule.
(Valium)